A complete digital intelligence platform for your most important asset — your home.

HC
Know Your Home Completely 3D exterior scan + 360° interior tour + AI-powered analysis of every system and surface.
$
Plan Projects Strategically Real costs, right sequence, no surprises. A 10-year roadmap built around your goals.
One Contact Handles Everything Your dedicated advisor coordinates vetted trades — all working from the same playbook.

INTERACTIVE DEMO · 4–5 MINUTES

2651 Pickerington Way
HUDSON, OH 44236 · EST. 1998

Good morning,
Henderson family.

Your Home Clarity report was updated 3 days ago. One item needs your attention.

78/100
Attention Advised
2651 Pickerington Way
$618K Est. Value
27yr Home Age
0.87 Acres
3 Action Items
HOME CLARITY AI

Your HVAC system is approaching the end of its service life. I recommend scheduling a professional assessment before next winter — I've outlined two options in your Systems report with estimated costs.

"Tap any section below to explore your complete report — or ask me anything about your home."

2651 Pickerington Way, Hudson OH

HOVER 3D SCAN · 2651 PICKERINGTON WAY

Henderson Residence

2651 Pickerington Way · Hudson, OH 44236
Report Date: April 2026 · Prepared by Hometown Builders Club

ES
Executive Summary
Overview · scores · key findings
78
EX
Exterior
Envelope · roof · siding · measurements
82
IN
Interior
Kitchen · bathrooms · living spaces
71
SY
Systems
HVAC · plumbing · electrical
64
SP
Strategy & Planning
Roadmap · budget · priorities
91
ES

Executive Summary

A complete assessment of 2651 Pickerington Way across four dimensions — exterior, interior, systems, and long-term strategy.

82
Exterior
71
Interior
64
Systems
91
Strategy
🔴
HVAC System (1998)

28-year-old system nearing end of life. Recommend replacement before next heating season.

🟡
Kitchen (Dated, Functional)

Original 1998 kitchen. High ROI opportunity — refresh or full remodel options outlined in Interior chapter.

🟢
Roof (2019)

7-year-old architectural shingle roof in excellent condition. 8–13 years of service life remaining.

HOME CLARITY AI

Based on your home's age and condition profile, I recommend prioritizing the HVAC replacement this year and the kitchen refresh in 2027. This sequence protects your home value while spreading the investment strategically.

Your Home in 3D

We use Hover's professional drone and photogrammetry technology to create a precise digital twin of your home's exterior.

2651 Pickerington Way — Hover 3D Scan
HOVER 3D SCAN · 2651 PICKERINGTON WAY
Precise Digital
Twin of Your Home
View 3D Model →
Precise measurements of every surface — no guessing, no estimating
Contractors bid from real data — faster quotes, fewer surprises
Material quantities calculated instantly for any exterior project

"Drag to rotate · Pinch to zoom · Tap any surface to inspect it"

EX

Precise Exterior Data

Every square foot measured. Every dimension recorded. This is the foundation contractors use to scope your project accurately.

4,831 Siding Sq Ft
5,157 Roof Sq Ft
3,428 Footprint Sq Ft
329'4" Perimeter
Footprint Plan
Floor Footprint
Roof Elevation
Roof Elevation
46 Roof Facets · 9/12 Dominant Pitch

Complex hip and valley roof geometry. Dominant pitch 65.45% of total roof area.

Walk Through Your Home

An iGuide 360° scan captures every room in precise detail — floor plans, measurements, and a fully navigable virtual tour.

360°
Interior Tour

Your iGuide scan gives us exact room dimensions, a precise floor plan, and a fully navigable virtual walkthrough — accessible from any device, anytime.

View Sample Tour →
All-room 360° photography
Accurate floor plan
Room-by-room measurements
Shareable link for contractors

"Contractors receive your iGuide link before their first visit. They show up prepared — not guessing."

IN

Kitchen Assessment

Dated — High Opportunity 71/100

Original 1998 kitchen. All appliances and fixtures are original. Functional but well behind current standards. The highest ROI improvement available on this property.

Appliances (28 yr)

All original. Replacement recommended — dishwasher shows slow drain, refrigerator cycles frequently.

Cabinetry

Solid construction. Hardware dated. Refinish or replace fronts depending on budget.

Countertops

Original laminate showing wear. Quartz or stone replacement highly recommended.

FULL PROJECT PROPOSAL
Henderson Kitchen
Transformation
READY TO REVIEW
Custom cabinetry + hardware INCLUDED
Quartz countertops — full perimeter INCLUDED
Full appliance package (6 items) INCLUDED
Tile backsplash + under-cabinet lighting INCLUDED
Layout redesign + island addition OPTIONAL
INVESTMENT RANGE
$75K – $150K+
6 WEEK
TIMELINE
SY

HVAC Assessment

Replace Before Winter 48/100
Lennox XC16 · Gas Forced Air
INSTALLED 1998 · AGE 28 YEARS
Past Service Life

Standard service life for a residential gas furnace is 15–20 years. At 28 years, this system is operating on borrowed time. Efficiency has dropped significantly — you're paying more in gas to heat the same space.

Standard Replacement
Recommended

96% AFUE gas furnace + new AC unit + thermostat. Licensed HVAC contractor, full permitting.

$9,800 – $13,500
Heat Pump System (Premium)

High-efficiency cold-climate heat pump. Higher upfront, lower operating cost. May qualify for federal tax credits.

$16,000 – $24,000
HOME CLARITY AI

At 28 years, your system could fail any time. I recommend the standard replacement this fall — I can brief two vetted HVAC contractors from my trade network and have quotes to you within 48 hours. Want me to set that up?

Ask Anything About Your Home

Your AI knows your property, your report, your projects, and your budget. It's available 24/7 and answers in plain language.

What would it cost to replace my windows?
HC
Based on your Hover scan, you have 26 windows across 3,240 sq ft. At Hudson-area pricing, full replacement runs $18,000–$32,000 for quality double-hung vinyl, or $32,000–$54,000 for fiberglass. I'd recommend doing this in Phase 3 of your roadmap — after HVAC and kitchen are addressed.
Which windows should I prioritize?
HC
The north and west-facing windows show the most thermal loss in your iGuide thermal scan. I'd start with those 8 windows before doing the full replacement — that's roughly $5,500–$9,000 and gets you 60% of the efficiency gain.
Ask anything about your home...

"AI is context-aware — it knows your report, your projects, your payment history. Every answer is specific to your home."

SP

Your 10-Year Home Plan

Every project, in the right order, with real costs. Built around your home's actual condition — not guesswork.

30
PROJECTS
Complete 10-Year Master Plan
Every system, room, and surface — prioritized, sequenced, and budgeted. Your full roadmap is in the Strategy chapter.
HVAC Replacement
Fall 2026 · Standard gas system
APPROVED · Q3 2026 $9,800–$13,500
Kitchen Refresh
Spring 2027 · New appliances, counters, hardware
PLANNED · Q2 2027 $50K–$75K
Master Bath Renovation
2028 · Spa-inspired transformation
VISION · 2028 $40K–$85K
Window Replacement
2029 · North + west elevation priority
VISION · 2029 $18K–$32K

Your Project, Fully Coordinated

When you approve a project, the entire coordination machine kicks in — all running on your Home Clarity data.

HCR Published
Your full Home Clarity Report is complete — measurements, photos, and AI findings all documented.
Project Scope Approved
You review the full scope, timeline, and investment range. You approve before any contractor is contacted.
Contractors Briefed
Your Hover scan, iGuide tour, and project specs are shared with vetted contractors. They arrive prepared — no tape measures, no guessing.
4
Work Begins
Clean, scheduled, communicated. You get updates through this portal. No calls chasing subcontractors.
Background-checked and licensed in Ohio
Reviewed on at least 15 completed HBC projects
Trained on Home Clarity briefing format
You never have to find, vet, or manage them

"Complexity lives in the engine. You experience simplicity on the surface."

Project Tracker

Track progress, communicate with your project lead, and never wonder what's happening with your home.

Week 3 of 6
ON TRACK
STARTED APR 2
EST. COMPLETE MAY 14
Demo & Rough-In DONE
Cabinet Installation DONE
Countertop Fabrication & Install IN PROGRESS
Appliance Delivery & Install SCHEDULED
Final Punch & Walkthrough PENDING

Quartz countertop was templated today. Fabrication begins Monday. Delivery and install scheduled for April 17-18.

— ADAM · AK RENOVATIONS

Invoices & Payments

Clear billing tied to project milestones. Pay by card or bank transfer — everything is logged in your portal.

$62,400
$18,720
#INV-2026-001
Initial Draw — Demo & Rough-In
PAID
#INV-2026-002
Draw 2 — Cabinets & Rough Electrical
PAID
#INV-2026-003
Draw 3 — Counters & Appliances
$18,720
DUE APR 17
HOME CLARITY AI

Draw 3 is due April 17 — countertop install is confirmed for that week. Your total investment for this project comes in at $62,400, well within your approved $75K range. Want a full payment history or a budget summary for the year?

Your Annual Service Plan

Choose the services you want coordinated. We handle scheduling, vetting, and follow-up — you just approve visits.

Lawn Care & Landscaping
~$475/mo · Apr–Nov · 0.87 acre
Snow Removal
~$1,800/season · as needed
House Cleaning (bi-weekly)
~$425/visit · 26 visits/yr
HVAC Tune-Up (bi-annual)
~$300/yr · spring & fall
Gutter Cleaning (2x/yr)
~$400/yr · spring & fall
Pest Control (quarterly)
~$900/yr · 4x annual
Window Washing (2x/yr)
~$550/yr · interior & exterior
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
LAWN
SNOW
CLEANING
HVAC/GUTTER

Everything, In One Place

Warranties, permits, appliance manuals, contracts — all organized and accessible from your phone.

DOC
Kitchen Refresh Contract
✓ Signed
PMT
Building Permit #2026-0342
✓ Active
SCN
Hover Measurement Report
PDF
WRN
Roof Warranty (2019)
PDF
HOME CLARITY AI

Ask me to pull any document: "Show me my refrigerator warranty" or "What are the permit conditions for my kitchen project?" — I can search everything in your document vault instantly.

Stay In the Loop

Push notifications keep you updated on everything that matters — without requiring a single phone call.

UPD
Today · 8:12 AM

Your countertop was templated this morning. Fabrication starts Monday. Install scheduled April 17.

INV
Apr 5 · 2:40 PM

Invoice #INV-2026-003 ready — $18,720 due April 17. Tap to pay.

DONE
Apr 2 · 7:55 AM

Cabinet installation complete. All upper and lower cabinets installed, hardware on. Moving to countertop phase.

Project milestone updates
Invoice due reminders
AI home health alerts
Scheduled service reminders
HBC

Most homeowners are guessing.

They don't know what their HVAC really costs to replace. They don't know which projects add value and which ones don't. They don't know what order to do things in.

You no longer have to guess.

This is your home. For the first time, it's working for you.

Adam Kilgore
FOUNDER · HOMETOWN BUILDERS CLUB

STEP 1 OF 17 · SWIPE OR USE ARROWS